Infrastructure Peer Review

Australia

Technology, Colocation

Infrastructure Peer Review

  • RED reviewed the electrical infrastructure design and provided a number of engineering options which resulted in reduced cost and a simplification of the design whilst still achieving TUI Tier III certification. These included:
  • Removal of some static switches
  • Rearrangement of HV Ring main units to facilitate simplified cable distribution
  • Review of detailed design calculations led to a reduction in cable and breaker sizes
  • New philosophy for power supplies to cooling units resulted in significant reductions in cabling
  • Change from centralized fuel store requiring huge fuel tanks on Day 1 and extensive pipework distribution to local belly tanks on each generator. This one item saved over $1m

Client: Confidential

Location: Australia

Period: 2012

Related projects

Digital Realty Watford

UK

Digiplex Oslo Data Centre, Norway

Norway

Digital Realty Cressex

UK

Ark Data Centre

UK

All Projects

Have a question?

Get in touch