Article contents
An AI model can generate an image in seconds or work through a problem that would take a human hours, but behind every prompt is some seriously hard-working hardware: racks of high-performance GPUs, vast amounts of computing power and infrastructure that has to keep everything running without interruption.
AI might live in the cloud, but the infrastructure powering it is very much a physical thing - and that comes with a cost.
AI factories demand huge amounts of electricity, generate significant heat and put additional pressure on water supplies. Add in the land and power infrastructure needed to support ever-larger facilities, and it’s not hard to see why data centres are facing growing scrutiny.
So, are AI data centres bad for the environment? That depends on how they’re designed, where their energy comes from and what happens when all that computing power starts generating heat.
We've previously looked at the truth and myths about data centres and demand, but AI is adding new pressures to an already complex debate. Here, we look at the evidence behind AI's environmental impact, the engineering decisions that can help reduce it, how to design more sustainable data centres and how sustainability reporting can demonstrate progress towards net-zero goals.
Why are AI data centres under greater environmental scrutiny?
The environmental cost of AI isn’t just about the electricity used to answer a single prompt. Individual AI tasks are becoming more energy-efficient, but more people are using AI, and increasingly complex applications need more computing power to run.
That growing demand has consequences for the infrastructure behind it.
Energy consumption and carbon emissions
GPU-driven workloads are dense. Rack power has gone from around 10kW to 130kW in barely any time at all, and next-generation platforms are heading for 230kW and beyond. According to the International Energy Agency's (IEA) 2026 analysis, electricity demand from AI-focused data centres grew by 50% in 2025 alone. By 2030, it's expected to triple from 2025 levels.
More power per rack means more electricity per square metre - and the carbon attached to it depends entirely on what’s supplying it. The IEA expects renewables to meet around half of the growth in data centre demand, with natural gas and nuclear also contributing - so expanding AI capacity sustainably will depend in part on whether cleaner energy can keep pace with demand.
Water consumption
Then there's the water needed to manage all that heat. Cooling a rack of GPUs is one thing, but getting rid of the heat without creating an environmental headache is quite another.
Some data centres use evaporative cooling, which loses water as it removes heat from the system, but electricity generation uses water too - meaning a facility’s water footprint can extend well beyond its own site.
As we covered in our article on water usage in data centres, switching to a system that uses less water doesn’t automatically make it the more sustainable option. Berkeley Lab’s 2024 study estimated that US data centres directly consumed around 66 billion litres of water in 2023, and put indirect use - the water evaporated at power stations generating the electricity - at around 800 billion litres.
In other words: you can switch the tap off in the data hall and leave it running at the power station.
Land and materials
The environmental cost starts well before anyone switches the servers on. Building a large AI data centre takes land, construction materials and supporting power infrastructure, all of which can affect local habitats and generate emissions before the first GPU runs a single workload.
Then there’s the hardware itself: AI racks are upgraded almost annually, so the equipment inside has a shorter life than the building around it.
That’s carbon that never appears on an electricity bill - and rarely appears in a report either.
More efficient chips don’t automatically mean greener data centres, as gains in performance per watt can be swallowed up by growing demand. We explored a similar irony in our piece on whether data centres could go into space.
How to design sustainable data centres for AI
NVIDIA and other chip makers talk about sustainable computing in terms of efficiency, renewable energy and net-zero goals. But sustainable data centre AI also depends on the building around those chips, which determines how much power the facility needs and how effectively it can manage the heat.
Start with the site
Sustainability starts before the building does. A site decides what kind of grid connection is available, how much low-carbon power can be realistically secured, how much water is available locally, and whether anyone nearby could use the waste heat. Once the facility is up, changing any of those fundamentals gets expensive quickly.
In a market like the UK, where grid capacity is already stretched thin, a site with a credible route to low-carbon power is worth more than one that simply looks good on paper. Reusing previously developed land can also limit the need to clear untouched ground.
The early decisions tend to have the longest consequences, so this isn’t the stage to cross fingers and hope for the best.
Reduce the load first
The easiest energy to save is the energy you never use. Losses in power distribution, oversized plant and cooling systems working harder than necessary all waste electricity - and in a facility running AI around the clock, they add up fast.
Every watt lost to inefficiency is also a watt not turned into tokens. Design around what the GPUs actually need, not a worst-case guess, and don’t spend money building capacity that’ll sit there doing nothing.
Then clean up the supply
Using less power helps, but cleaner power cuts carbon emissions. That means planning for renewables, grid capacity and battery storage from the start.
Storage matters more than it sounds. AI workloads spike rather than draw smoothly, but batteries help manage those peaks, helping facilities get more from their grid connection and potentially helping support the wider grid. Running flexibly instead of demanding full power 24/7 can also free up hundreds of megawatts of IT capacity on the same connection, which we explored in our piece on NVIDIA’s Rubin platform.
Design cooling around local water and energy limits
Cooling needs to be planned around the site's available water and power, with the trade-offs assessed before a system is chosen. The design also needs to account for how much electricity the cooling equipment itself will use, and whether the grid connection can support that demand alongside the GPUs.
There are also opportunities to make better use of the heat itself, particularly where nearby buildings can use it. We’ve looked at the engineering behind these decisions in our article on the future of cooling and energy infrastructure.
Think in lifetimes, not just operations
Operational efficiency is only part of the carbon cost. The building, its supporting infrastructure and the hardware all have embodied carbon, and the cheapest way to cut it is to avoid building twice.
Take cooling. A facility designed around air-based free cooling might look efficient on day one, but it leaves no way to liquid-cool GPUs - and no way into the AI market for the lifecycle of the building. That can leave an operator with a costly choice: rebuild, retrofit or watch the building fall behind - extra cost and carbon that better planning could have avoided.
Designing for adaptability helps keep a facility useful for longer. Modular systems and offsite construction can also shorten build programmes, while adaptable designs can help keep facilities useful for longer.
The most sustainable building is the one you don’t have to rebuild.
Proving it with a credible sustainability report
Sustainability claims are easy to make; proving them takes data. A credible sustainability report shows what a data centre is actually doing to reduce its environmental impact, rather than what it hopes to achieve.
Under EU regulations, operators of data centres with 500 kW or more of IT power capacity must report annually under Delegated Regulation (EU) 2024/1364. The reporting covers energy, water, renewable energy and heat reuse, using four key indicators: PUE (power usage effectiveness), WUE (water usage effectiveness), ERF (energy reuse factor) and REF (renewable energy factor).
It’s a useful framework, but notice what none of them tells you on its own:
- PUE shows how efficiently power reaches the IT - not how clean that power is, or how much useful work the IT does.
- WUE covers water at the site - not at the power station.
- REF shows the renewable share - not the embodied carbon in the build.
These metrics can also pull in different directions: cut water use and PUE can rise; chase a lower PUE and water use can climb. The European Commission's proposed data centre rating scheme includes an explanatory document on exactly that trade-off.
A sustainability report that only tells you what happened is a post-mortem. By the time the numbers come in, the building is built and the big decisions have been made, so set the targets during design - while there’s still time to do something about them.
Sustainable AI infrastructure is designed in, not bolted on
AI isn’t going to wait for the industry to get comfortable. Demand is rising, racks are getting denser, and the infrastructure supporting it needs to keep up. The trouble is that decisions made to get a data centre online today can leave it expensive to adapt tomorrow.
More efficient chips will help, but that only counts if the building around them is engineered to match: the right site, a credible low-carbon supply, cooling matched to local conditions, and a design that doesn’t need ripping out in five years.
At RED, we design around the IT from the outset, with infrastructure built to support it and keep pace as requirements change. That means making design decisions that leave room for new hardware and higher-density workloads.
For more on AI's impact on data centre design and innovation, visit The Centr or find out about our data centre design services.
Join Team RED
Join our award-winning team! We’re seeking talented individuals across all regions and experience levels. Explore exciting opportunities to make a difference today!
Find out more