Projects

DLR, Amsterdam

RED carried out the detailed design and site supervision for the fit out of the First Floor of an existing live Data Centre Facility giving 1500m² of Technical Space at a supported load of 2160kW giving approximate load density of 1400W/m2. In addition, the project encompassed the fit out of Ground Floor offices which was provided with a standalone Standby Generator and comfort cooling systems. 

Data Hall installations comprised of roof mounted air cooled free cooling chillers, standby generators, static UPS machines, associated LV Switchpanels and PDUs c/w ATS changeovers. Fire suppression to the Technical Space and associated electrical plant rooms was provided by means of Water Mist System.

Client:

Confidential

Location:

Netherlands

Services:

MEP Services

Sectors:

Technology

Sub‑sector:

Colocation

Period:

Completed 2012