Projects

Vision Labs

The project involved the conversion of an existing empty warehouse building into a new Lens coating facility and the provision of a link corridor to an existing production facility.

The project comprised:

  • Two new production area clean rooms at ground floor level, constructed to EN14644 class 7
  • A new first floor mezzanine level, with open plan and cellular process rooms and support areas all constructed to EN14644 class 8
  • A number of specialist services as detailed including de-ionised water, process ventilation systems, process drainage and compressed air to serve the client’s production equipment outlets
  • Air conditioning, ventilation, IT cooling, general drainage, hot and cold water services.

The clean room certification exceeded BS/EN/ISO 14644-1 Standards and all rooms achieved class 7 minimum. Product quality has increased significantly and the first batch runs indicated a 50% reduction in product defect / faults. The deionised water quality was of such purity that Vision Labs immediately made a business case for an identical system elsewhere on the site.

Client:

The DCM Partnership

Location:

UK

Services:

MEP Services

Sectors:

Life Sciences

Sub‑sector:

Pharma & Biotech

Period:

Completed 2012

Ready to join the team?

If you think you have what it takes to join an award winning team and help RED continue its exciting journey, we want to hear from you.

Search Open Positions