Wembley W03

W03 is a twin tower residential scheme comprising of 340no. mixed use apartments in Wembley, London.

The key mechanical and electrical services include:

  • District heating substation network providing Low Temperature Hot Water to the apartments for space heating
  • Smart in-house BT fibre broadband system connected to the sitewide Wembley broadband network
  • Dual fed smoke extract and supply ventilation system providing chilled air to the communal corridors

RED Solution

  • Commissioning management of the mechanical, electrical and public health services
  • Commission-ability reviews of the mechanical and electrical services schematics and specifications
  • Technical reviews of the commissioning method statements.
  • Charing and coordination of monthly building services commissioning meetings on site discussing key trade-to-trade interfaces and interdependencies
  • Production of fortnightly look-ahead schedules highlighting the key upcoming testing and commissioning works
  • Hands on approach to solve engineering problems.
decorative arrow

Key Facts

  • All 340No. Apartments will be on a let-only basis.
  • Each apartment includes sub-metering for the electrical, heating, cold and hot water consumption to allow individual billing.,
  • The apartments form part of a converged network which connects and monitors the access controls, fire alarm, broadband and BMS to ensure this is operated on one platform

Client:

Box & Charnock

Location:

UK

Capabilities:

Specialist Engineering

Sectors:

Living, Learning and Leisure

Sub‑sector:

Commissioning Management
Residential

Period:

Overall project completion is due September 2019